Following the building process of our Mediterranean 2 split level design by Montgomery Homes, on a sloping block.
Showing posts with label Frames Windows and Brickwork. Show all posts
Showing posts with label Frames Windows and Brickwork. Show all posts
Friday, October 30, 2009
Brickwork Nearly Finished
Most of the brickwork is finished. The front and both sides are pretty much done and the back of the house has the brick level up about half way. Should be all done tomorrow I'm thinking since most of this lot in the photos has been done in the last 2 days so still drying. Was meant to be fnished and with the roof etc on by now but apparently the brickies went away for a week when the superviser had booked them, and then it rained for a few days, so it got a bit behind......Still going fast tho.


Wednesday, October 21, 2009
Sliding Doors In
Tuesday, October 13, 2009
Monday, October 12, 2009
Roof Frames
Thursday, October 8, 2009
Wednesday, October 7, 2009
Upper level flooring
All the beams are on for the upper flooring to go on and the upper frames should go up tomorrow. They had a crane there this morning lifting all the beams and wall/roof frames onto our block from where it was left over the long weekend (on the vacant block next to ours). Good thing the owner of that block didn't see it or get upset it was there.
One of the neighbours took some photos for us of the crane doing it's bit. Photos below are of the finished floor beams. Can see in the 2nd botom photo all the flooring to sit on the beams and the wall frames.

One of the neighbours took some photos for us of the crane doing it's bit. Photos below are of the finished floor beams. Can see in the 2nd botom photo all the flooring to sit on the beams and the wall frames.

Wednesday, September 30, 2009
Scaffolding for upper levels
The scaffolding is up for the builders to start the upper levels. They also have the formwork in place for the suspended concrete deck at the front to be poured. The deck should be done this week and the framework for upper levels will be delivered. Site superviser said the upper framework will be going up next week and then the brick layers will be back to complete the brickwork after that. I'm thinking if all goes well the frames windows and brickwork for the whole house should be done within a few weeks.


Saturday, September 26, 2009