Wednesday, October 7, 2009

Upper level flooring

All the beams are on for the upper flooring to go on and the upper frames should go up tomorrow. They had a crane there this morning lifting all the beams and wall/roof frames onto our block from where it was left over the long weekend (on the vacant block next to ours). Good thing the owner of that block didn't see it or get upset it was there.

One of the neighbours took some photos for us of the crane doing it's bit. Photos below are of the finished floor beams. Can see in the 2nd botom photo all the flooring to sit on the beams and the wall frames.